Current cost estimates demonstrate competitive advantage against Li-ion and pumped hydro for 4, 8 and 12 hour storage durations.

And our path to lower capital costs and higher efficiencies will be delivered with -

  • Our planned increase of the upper end of the technology’s operating temperature range to 3000⁰ Celsius

  • Industry developments in supercritical and ultra-super critical turbine technology

Medium Duration Storage
250MW Power Plant 1000MW Hours of Storage
  LI-ION
CSIRO#
THERMAL
Sunlands Co. TES Cells
Storage Duration (hrs) 4 4
Discharge duration per cycle (hrs) 4 4
Capital Cost ($m) 446 300
30yr Capex ($m/MWh) 0.45/0.81 0.3
30 Yr LCOS ($/MWh) 219 - 250 80 - 136
Long Duration Storage
250MW Power Plant 1500MW to 2000 MW Hours of Storage
LI-ION PUMPED HYDRO THERMAL
  CSIRO# Case Study*
(Mt. Kidston)
CSIRO#
(Excludes T&D)
Sunlands Co. TES Cells
Storage Duration (hrs) 8 8 6 8
Discharge duration per cycle (hrs) 8 8 6 8
Capital Cost ($m) 891 924 581 350
30yr Capex ($m/MWh) 0.44/0.81 0.46 0.39 0.17
30 Yr LCOS ($/MWh) 210 - 242 121 - 161 106 - 145 46 - 103
Very Long Duration Storage
250MW Power Plant 3000MW Hours of Storage
PUMPED HYDRO THERMAL
CSIRO# Sunlands Co. TES Cells
Storage Duration (hrs) 12 12
Discharge duration per cycle (hrs) 12 12
Capital Cost ($m) 675 400
30yr Capex ($m/MWh) 0.22 0.13
30 Yr LCOS ($/MWh) 60 -101 35 - 92
ASSUMPTIONS Pumped Hydro Sunlands Co. TES Li-ion
RTE 75% 53% 95%
Cycles per annum 334 358 358
DoD (% Nameplate) N/A 95% 75%
End of life capacity (% Nameplate) N/A 100% <70%

CALCULATIONS
All capex in A$2021 dollars; capex includes replacement of Li-ion batteries at end of 15 year assumed life with 1.4% per annum capital cost reduction curve. LCOS comparisons adopt 30-year service period. Operation based on single cycle discharge.


SOURCES
# CSIRO: Graham, P., Hayward, J., Foster J. and Havas, L. 2021, GenCost 2020-21: Final report, Australia.
CSIRO: Graham, P., Hayward, J., Foster J. and Havas, L.2020, GenCost 2020-21: Consultation draft, Australia.
* Genex Power Limited: Kidston Pumped Storage Hydro Project: Financial Close Report, August 2021